#10745
Posted 3 months ago Iran Expert Proposals 2 Duration 01 to 03 months
Description

Vendor Engineering Documents shall be generated and/or reviewed as an integrator team. Also software programing shall be provided to complete engineering activities promised by vendor. Complete or Partial document generation are acceptable. Preliminary Document List:
# Description
1 Factory Acceptance Test (FAT) Procedure
2 Site Acceptance Test (SAT) Procedure
3 Control System Architecture
4 I/O List
5 Calibration Procedures for Instruments
6 Flow Computer Datasheet
7 Pre-Amplifier Datasheet
8 Proximity Switch Datasheet
9 Density Meter Datasheet
10 DNP3 Card Datasheet
11 Operating Manual
12 Workstation and Printer Specification
13 Control Cabinet Diagram and BOM
14 Loop Diagram
15 Control Panel Termination Arrangement
16 Factory Acceptance Test (FAT) Report
17 Site Acceptance Test (SAT) Report
18 Standards and Certificates
19 Compliance Report
20 UPS Consumption List
21 UPS Datasheet
22 Flow Switch Datasheet
23 Temperature Switch Datasheet
24 Prover Datasheet
25 Safety Certificates of All Equipment

26 – Configuration and Programing of Flow Computer
– Programing of DNP3
– Design and Programing of Reports
– Network Configuration”

Skills & Expertises
Project Proposals (2)
  • Placeholder Image
    Ahmad
    2 months ago
    3,000,000,000Rls

    in hours

    5000000 rials/h
  • Payam
    2 months ago
    500,000,000Rls

    in hours

    I am an Instrumentation and control system engineer with reference in Metering system Design - supervision and consultan Please see my Resume
Fixed
Never Expire
Share this job
About the Clients
Namavaran Online Engineering Company
Member since October 26, 2024
  • 6

View Profile